2012 Mooring BS3
ULS IPS4 serial # 1043
The first step during setup was to open the case to connect the
battery pack.
To have computing backup, I programmed the USL from the laptop
"Lukas". I installed the software provided in the shipping case:
"Ips5Link" for a ULS5, followed by "IpsLink" for the slightly older
IPS4 to be deployed this year. In hindsight, it may have been better
to install in reverse - installing the older software first - but I did not
run into problems using it.
I received email from Rick Krishfield with the suggested configuration,
as well as a configuration file for the Ips4043.
I used the cable provided with the unit and the Ipslink software
version 2.00.04 to connect to the instrument. It was set to the correct
GMT time using the Date/Time tab. Next, I loaded the configuration file
provided by Rick. For good measure, I also saved the configuration
then to another file - but for some header and battery information, the
two are identical.
In the "Deploy" menu, I set the parameters as listed in Rick's email,
and also set a start/end date. I then saved the parameters in the file
bs3_uls41043_2012to2013.dpl, then hit the button "Deploy Unit".