Deployment 2022 to 2024:
WH300 ADCP "BS3a"

mounted in top float

Example of a 20-day time series plot generated by Dan Torres,
taken from his website for this dataset.
Deployment summary:
Duration: Nov 5, 2022 to Sept 17, 2024
Location: 71° 23.646' N, 152° 3.071' W in 146 meters of water
Variables measured:zonal, meridional velocity
Sensor information: 300KHz WorkHorse by RDInstruments ser# 2226.
Final data: contained in the matlab file aon22_bs3a_Final1.mat ;
    the data format is described in readme_format_Final1_ice.txt .



Data processing:

The final data were provided by Dan Torres, who described his work in these notes.
He also provided the instrument's download log.
Various summary figures as well as time series of ADCP variables including
u, v, w, e, and others can be found on his above-mentioned website for this dataset.