Deployment 2022 to 2024

Nov 5, 2022 to Sept 17, 2024


Click below to enlarge this jpeg version of the mooring diagram, or click here for the PDF version.

Instrumentation included:
- ALS Ice Profiling Sonar "IPS5"
- TRDI "WH300" ADCP in surface float ("BS3a")
- Satlantic SUNA nitrate sensor
- TRDI "WH300" ADCP, same cage as SUNA ("BS3b")
- Seabird/Wetlabs fluorometer
- 8 Seabird microcats, distributed between the surface float and the deep ADCP cage
- TRDI "WH75" ADCP ("BS3c")
- Aural whale song recorder

The mooring was deployed on November 5th 2022 from the R/V Sikuliaq during
the cruise SKQ2022-15S. It could not be recovered as planned during the
USCGC Healy cruise HLY2401 in July due to "impenetrable rubble ice at
the BS3 mooring site", as noted in the HLY2401 cruise report. Instead it
was recovered during the CCGS Louis S. St-Laurent's BGOS cruise on September 17.

BS3 site in July; photo by Robert Pickart.
BS3 top float during recovery in September; photo by Mary-Louise Timmermans .