Deployment summary: Duration: deployed from Oct 16, 2012 to Oct 16, 2013, but recorded only 12 days Location: 71° 23.650' N, 152° 2.888' W in 147 meters of water Variables measured:zonal, meridional velocity Sensor information: 75KHz LongRanger by RDInstruments ser# 1468. Initial: contained in the matlab file aon13_bs3b_all_raw.mat the data format is described in init_format.txt . Data processing: When downloading the data onboard Healy, the instrument did not respond when powered by its own batteries. This is consistent with its early recording stop being due to loss of battery power. When hooked up to external power, a clock check found the LR75 to be 5 min 17 seconds late. The data were not fully processed due to the early failure of the instrument. They have been converted from their original RDI format into matlab, and a first cut compass correction has been applied. |
|
|