Deployment 2009 to 2010



click the above thumbprints to enlarge; find more photos here

Click below to enlarge this jpeg version of the mooring diagram, or click here for the PDF version.



The mooring was deployed off the USCGC Healy on Aug 4, 2009 local time,
close to midnight GMT, at 71° 23.627' N, 152° 3.820' W.
It was recovered on Sept 13, 2010.
Instrumentation included:
- Arctic Winch, on subsurface float
- 300KHz ADCP, on subsurface float
- SBE39 "microcat", on subsurface float
- ULS type IPS5 Ice Sonar, on subsurface float
- coastal moored profiler "CMP"
- 75KHz ADCP near bottom
- SBE39 "microcat" near bottom
- SBE52 pressure gauge near bottom

The mooring diagram also lists a PCO2 sensor, but I do not recall it nor see it
in my pictures from the mooring launch.