Deployment 2008 to 2009


Click below to enlarge this jpeg version of the mooring diagram, or click here for the PDF version.



The mooring was deployed off the USCGC Healy on Aug 13, 2008 at 71° 24.090' N, 152° 2.820' W.
It was recovered on July 29, 2009.

Instrumentation included:
- Arctic Winch, on subsurface float
- coastal moored profiler "CMP"
- 75KHz ADCP near bottom
- SBE39 "microcat" near bottom

Unfortunately there was some confusion about the name of this mooring. It was deployed during the 2008 NOPP cruise, following a set of mooring deployments along an offshore line located further east (downstream) near 149° W. It was not known until late into that cruise that a mooring would be deployed at the "BS3 site" near 152 ° W. By that time, one of the moorings along the 149° W line had already been named "BS3". Therefore, on that cruise, the "additional" mooring near 152° W, launched last, was named "BS4". It is this name that was used, for example, in the above mooring diagram.

With renewed funding to occupy the 152° W site for a longer time series under AON, tying together and extending occupations from the earlier SBI and NOPP programs, a decision was made to re-name the 2008-2009 152° W mooring "BS3" to reflect the common location.